What kWattWorks does, how engagements are priced, what counts as a verified result, and what we need from you to start. If your question is not here, ask it directly.

01 / ABOUT KWATTWORKS

What we are, and what we are not.

What is kWattWorks?+

kWattWorks helps construction, industrial, and remote-site teams understand what site power costs — and what they could save instead. We model your current setup against practical alternatives, help integrate the right mix of grid, generator, and battery equipment, and verify the results against our numbers.

Are you a battery company, or do you sell or rent equipment?+

No. We don’t manufacture, sell, or rent power equipment — our model isn’t built to move a specific product. We work with established manufacturers to specify, size, and manage the combination that fits your site, schedule, and numbers.

Is this a sustainability or green energy program?+

Not primarily. We treat power like labour, equipment, or materials: a cost to be understood, priced, and managed. Lower diesel use and emissions can be real outcomes, but the business case starts with cost control and better energy decisions.

02 / HOW IT WORKS

Method, scope, and pricing.

What does Model → Integrate → Verify mean?+

Model: we compare your current power costs against practical alternatives before you commit money. Integrate: if the numbers make sense, we help source, size, and manage the right mix of grid, generator, and battery equipment. Verify: we measure the result against the model, turning “should save” into a number you can stand behind.

What if we only want the numbers, not a full project?+

Yes — a Model engagement can stand alone. Many clients stop there because the numbers themselves are the useful part, whether they act on them with us or not.

How is pricing structured?+

Model engagements are typically a fixed project fee. Integrate engagements usually tie part of the fee to verified savings rather than billing it all upfront. Either way, you’ll know what the opportunity looks like before committing to a larger change.

How is this different from asking our equipment supplier or GC?+

Suppliers model around the equipment they provide, and GCs are focused on building the job, not owning the power strategy. kWattWorks sits in the gap: independent enough to compare options, practical enough to make the chosen solution work on site.

Could our own team do this in-house?+

Often, yes — if someone has the time to model load profiles against your actual utility rate structure and compare equipment across suppliers. In practice that work competes with delivering the job, so it gets estimated rather than modelled. That gap is the engagement.

03 / PROOF & RESULTS

Modelled, measured, and the difference between them.

Is this all projections, or do you have real results?+

Both — and we’re careful to label which is which. Completed work is described as measured or verified only when the data supports it; anything still in planning stays a modelled projection until it’s field-verified. See Projects for current and completed work.

What if the model turns out to be wrong?+

That’s why Verify exists. On Integrate engagements, we measure actual performance against the model. If savings-based pricing is part of the engagement, our fee depends on that verified performance — not on a projection.

04 / IS THIS FOR YOU

Where this work pays off.

Our generators run fine — why look at this at all?+

Because running fine doesn’t tell you what the power costs. Fuel, deliveries, rentals and servicing usually get rolled into one line. Most generators are also sized for the few minutes a day when everything runs at once. The rest of the shift they sit at low load, burning fuel and adding engine hours to meet demand that isn’t there. Modelling doesn’t assume anything is wrong. It puts a number on what your power costs.

What kinds of sites is this for?+

Sites where diesel-based temporary or remote power is a meaningful cost or operational constraint: tower cranes, hoists, temporary site power, remote work areas, off-grid operations, and high-rise or urban builds with limited, delayed, or expensive utility connections.

Do we need an existing power setup to start?+

No. Model works for an existing site or one still being planned. If you have just a basic plan or if you have early data — fuel logs, utility bills, generator run hours, equipment schedules, or load estimates — we can build an initial baseline proposal right away.

Do you only work with large contractors?+

No. Contractor size matters less than the size, cost, and complexity of the power problem. If power is a real line item, schedule risk, or recurring constraint, it’s worth a look into solutions that are more efficient.

Where do you operate?+

kWattWorks is based in British Columbia and currently focused on projects in B.C. and Alberta.

05 / GETTING STARTED

What we need, and how long it takes.

What do you need from us to get started?+

Rough project details, any consumption data you have, and a basic picture of how and where power matters most on site. Useful inputs: utility bills, fuel logs, generator run hours, equipment schedules, crane or hoist details, and remote work areas.

Will this slow down our project?+

No. A Model engagement runs alongside planning, not instead of it — the goal is a better power decision before changing course gets expensive.

How long does a Model engagement take?+

It depends on site complexity and how quickly the starting data is available. Smaller reviews move fast once the data is in hand; more complex sites need more modelling time. You’ll get a specific timeline before committing to anything.

STILL HAVE A QUESTION

Energy always gets paid for. It rarely gets accounted for.

If your question is not above, it is probably a good one. Send the project details and we will tell you whether modelling it is worth your time.

Let’s Model Your Project